Pulverized Coal Preparation Project

Equipment: LM2200M

Material: Coal

Capacity: 50t/h

Output size: 200 mesh

Location: Indonesia

Using time: October, 2015

Introduction

This project is mainly used for the preparation of pulverized coal for heating boilers. After the raw coal is ground by a coal mill, it is sorted by a separator. Unqualified pulverized coal will be ground again, Qualified finished products are collected and stored by pulse dust collector, The overall production capacity reaches 45-55T / H. This project takes the form of EPC, Set design, research and development, installation, training and integration, Ensure that the project is carried out in an orderly manner.

Recommended Case

LATEST EQUIPMENT

ORE PROCESSING

Request a Quotation

Thank you for your interest in Our Industrial Grinding Mill. If you want to get help immediately, please chat online now. At the same time, you can also fill in your requirements, we will reply you in 24hours.

*
*
*
*
*
*
*
*
*

Request a Quotation

Thank you for your interest in Our Industrial Grinding Mill. If you want to get help immediately, please chat online now. At the same time, you can also fill in your requirements, we will reply you in 24hours.

*Material:

*
*
*
*
*
*

Copyright © 2004-2021 by China Liming Heavy Industry Science and Technology Co. LTD All rights reserved Privacy Policy

Online

WhatsApp

Message

Top