Pulverized Coal Preparation Project
Equipment: LM2200M
Material: Coal
Capacity: 50t/h
Output size: 200 mesh
Location: Indonesia
Using time: October, 2015
Introduction
This project is mainly used for the preparation of pulverized coal for heating boilers. After the raw coal is ground by a coal mill, it is sorted by a separator. Unqualified pulverized coal will be ground again, Qualified finished products are collected and stored by pulse dust collector, The overall production capacity reaches 45-55T / H. This project takes the form of EPC, Set design, research and development, installation, training and integration, Ensure that the project is carried out in an orderly manner.
Recommended Case
- > Limestone production line in Vietnam
- > LM vertical roller mill for limestone powder making
- > Limestone powder production line
- > Limestone sand powder preparation
- > 30 TPH limestone grinding production line in India
- > Case of 300,000 tons of limestone per year
- > Ultrafine calcite powder production project
- > 20t/h LM vertical coal mill site
- MORE