
Powder preparation project for aluminum electrolyte slag
Equipment: MTW European trapezium grinding mill
Material: Electrolyte waste slag
Capacity: 15t/h
Output size: 150 Mesh
Location: China
Using time: 2025
Introduction
This project is the Electrolyte Waste Residue Recycling Project of Xinjiang Company under Xinfa Group. To ease the storage pressure of the residue yard in the anode assembly workshop, extract renewable resources, further reduce raw material costs and enhance the enterprise’s economic benefits, the electrolyte waste residue is ground to a fineness of approximately 150 mesh using advanced grinding equipment. Subsequently, the ground residue is reintroduced into electrolytic cells for metallic aluminum extraction, ultimately realizing the recycling of electrolytic aluminum.