Blast Furnace Pulverized Coal Preparation Project

Equipment: LM1700M

Material: Bituminous coal

Capacity: 70t/h

Output size: 200 mesh, D80

Location: Indonesia

Using time: 2016

Introduction

The pulverized coal preparation project has a capacity of 20-26T / H. The main processing material is a mixture of bituminous coal and anthracite, which is used in a steel plant's blast furnace coal injection system. The raw coal is sent to the vertical coal mill through a closed quantitative coal feeder, and the hot air from the heating furnace enters from the air inlet. After sufficient heat exchange with the raw coal being milled in the mill, the coal powder is brought to the separator. Sorting, the coarse coal powder with unqualified fineness falls on the grinding disc again for grinding, and the fine coal powder with qualified fineness enters the explosion-proof gas box pulse dust collector and is collected. The whole system is operated under negative pressure. No spillage, thus ensuring the cleanliness of the site.

Recommended Case

LATEST EQUIPMENT

ORE PROCESSING

Request a Quotation

Thank you for your interest in Our Industrial Grinding Mill. If you want to get help immediately, please chat online now. At the same time, you can also fill in your requirements, we will reply you in 24hours.

*
*
*
*
*
*
*
*
*

Request a Quotation

Thank you for your interest in Our Industrial Grinding Mill. If you want to get help immediately, please chat online now. At the same time, you can also fill in your requirements, we will reply you in 24hours.

*Material:

*
*
*
*
*
*

Copyright © 2004-2021 by China Liming Heavy Industry Science and Technology Co. LTD All rights reserved Privacy Policy

Online

WhatsApp

Message

Top