Blast Furnace Pulverized Coal Preparation Project
Equipment: LM1700M
Material: Bituminous coal
Capacity: 70t/h
Output size: 200 mesh, D80
Location: Indonesia
Using time: 2016
Introduction
The pulverized coal preparation project has a capacity of 20-26T / H. The main processing material is a mixture of bituminous coal and anthracite, which is used in a steel plant's blast furnace coal injection system. The raw coal is sent to the vertical coal mill through a closed quantitative coal feeder, and the hot air from the heating furnace enters from the air inlet. After sufficient heat exchange with the raw coal being milled in the mill, the coal powder is brought to the separator. Sorting, the coarse coal powder with unqualified fineness falls on the grinding disc again for grinding, and the fine coal powder with qualified fineness enters the explosion-proof gas box pulse dust collector and is collected. The whole system is operated under negative pressure. No spillage, thus ensuring the cleanliness of the site.
Recommended Case
- > Limestone sand powder preparation
- > LM vertical roller mill for limestone powder making
- > Limestone production line in Vietnam
- > Limestone sand powder preparation in India
- > 60TPH LM35-3N Slag Grinding Mill In Fujian, China
- > 17TPH MTW178 Limestone Grinding Mill In Xinjiang, China
- > 7TPH MTW145G Limestone Grinding Mill In Sichuan, China
- > LM150N Vertical Mill, Process slag, 325mesh, 12tph
- MORE